Short answer: in 2026 Dreamery prices bathrooms as labor plus rough materials — demolition, waterproofed shower, tile setting, vanity installation, fixtures, plumbing and electrical — and you buy the finish materials (tile, fixtures, a stock vanity) at retail with our exact shopping list, so there is no markup hidden in the number. A custom vanity from our Coral Springs shop is quoted as its own line. A small full bath (5×8) runs $13,500–$15,500 in labor at the Essential level, $17,000–$19,500 at Signature and $21,500–$24,500 at Premium, plus roughly 35–70% of that for finish materials. Powder rooms start around $7,000 in labor; primary suites run $27,000–$49,000. Turning a tub into a walk-in shower adds about 25%. The figures are based on our own signed contracts and quotes, not a national survey — get the range for your bathroom in 60 seconds with our cost calculator.
For your own bathroom, the bathroom remodel cost calculator gives the labor range for your size and finish level in about a minute.
What is inside the number
A bathroom quote is shorter than a kitchen quote, but the lines matter just as much when you compare companies:
| Line item | What it covers | What moves it |
|---|---|---|
| Demolition and disposal | Tub or shower, tile, vanity, floor; debris out | Tile on mortar bed vs. on board; second-floor rooms |
| Plumbing | Drain relocation for a tub-to-shower conversion, new valves, supply lines | How far the drain moves; cast-iron drains in older houses |
| Waterproofing and shower build | Sloped pan, membrane, curb or curbless detail, niche, bench | Curbless (more slab work), size, bench |
| Tile and stone | Floor, shower walls, sometimes full-height walls | Large-format porcelain vs. mosaic vs. natural stone; pattern |
| Vanity and storage from our shop | Vanity sized to the wall, linen tower, medicine cabinet | Width, drawers vs. doors, finish |
| Countertop, sinks, fixtures | Quartz top, undermount sinks, faucet, shower set, toilet | Fixture grade; two sinks vs. one |
| Glass | Frameless shower enclosure or panel | Size and configuration |
| Electrical and ventilation | Lighting, GFCI outlets, properly sized exhaust fan | New circuits; fan ducted through the roof |
| Project management | Scheduling, coordination, association paperwork | Condo packages |
Three shapes of project
- Tub-to-shower conversion in an otherwise sound bathroom. The tub comes out, a waterproofed walk-in shower goes in, the vanity and lighting are updated. The most common project in Boca Raton‘s and Delray‘s country-club and 55+ communities, and the lower half of the range.
- Full gut of a 1950s–70s bathroom. Everything to the studs, drains and supply lines replaced, floor releveled, new layout. Typical of Fort Lauderdale, East Boca and Delray ranch homes — the middle to upper part of the range, mostly because of plumbing.
- Two bathrooms at once. The primary and a hall or kids’ bath in one project: one crew, one schedule. Doing both together costs noticeably less than two separate projects.
What moves a bathroom up or down the range
- Moving the drain. A shower where the tub was is usually a short move; a new layout in a condo may not be possible at all because of the stack.
- Curbless. A true curbless shower needs the slab recessed or the floor built up — more labor than a low curb.
- Tile choice. Large-format porcelain is fast to lay; small mosaics and natural stone take longer and cost more per square foot.
- Old plumbing. Cast-iron drains under a 1960s slab often need replacing while the room is open; we look during the consultation and price it up front.
- Condo logistics. Elevator, work hours and the board package add time more than money.
How to compare two quotes
- Ask how the shower is waterproofed — pan, membrane, and what goes behind the tile. “Cement board and tile” is not a waterproofing system.
- Ask whether the vanity is a stock box or built to the wall, and what the box is made of.
- Check that demolition and disposal are included.
- Ask how the price can change after signing. Ours is fixed in the contract; additions are priced in writing before they are done.
Paying for it
Only a 10% deposit when you sign the contract; the rest is paid in stages tied to delivery, install start and the final walkthrough. Promotional financing may be available for qualified buyers through our lending partners; pre-qualification takes about a minute with a soft credit pull. See financing.
For kitchens, see the kitchen cost guide; for how the bathroom process runs, see bathroom remodeling.