D R E A M E R Y

Bathroom Remodel Cost in Broward & Palm Beach (2026): What Our Contracts Show

Short answer: in 2026 Dreamery prices bathrooms as labor plus rough materials — demolition, waterproofed shower, tile setting, vanity installation, fixtures, plumbing and electrical — and you buy the finish materials (tile, fixtures, a stock vanity) at retail with our exact shopping list, so there is no markup hidden in the number. A custom vanity from our Coral Springs shop is quoted as its own line. A small full bath (5×8) runs $13,500–$15,500 in labor at the Essential level, $17,000–$19,500 at Signature and $21,500–$24,500 at Premium, plus roughly 35–70% of that for finish materials. Powder rooms start around $7,000 in labor; primary suites run $27,000–$49,000. Turning a tub into a walk-in shower adds about 25%. The figures are based on our own signed contracts and quotes, not a national survey — get the range for your bathroom in 60 seconds with our cost calculator.

For your own bathroom, the bathroom remodel cost calculator gives the labor range for your size and finish level in about a minute.

What is inside the number

A bathroom quote is shorter than a kitchen quote, but the lines matter just as much when you compare companies:

Line item What it covers What moves it
Demolition and disposal Tub or shower, tile, vanity, floor; debris out Tile on mortar bed vs. on board; second-floor rooms
Plumbing Drain relocation for a tub-to-shower conversion, new valves, supply lines How far the drain moves; cast-iron drains in older houses
Waterproofing and shower build Sloped pan, membrane, curb or curbless detail, niche, bench Curbless (more slab work), size, bench
Tile and stone Floor, shower walls, sometimes full-height walls Large-format porcelain vs. mosaic vs. natural stone; pattern
Vanity and storage from our shop Vanity sized to the wall, linen tower, medicine cabinet Width, drawers vs. doors, finish
Countertop, sinks, fixtures Quartz top, undermount sinks, faucet, shower set, toilet Fixture grade; two sinks vs. one
Glass Frameless shower enclosure or panel Size and configuration
Electrical and ventilation Lighting, GFCI outlets, properly sized exhaust fan New circuits; fan ducted through the roof
Project management Scheduling, coordination, association paperwork Condo packages

Three shapes of project

  • Tub-to-shower conversion in an otherwise sound bathroom. The tub comes out, a waterproofed walk-in shower goes in, the vanity and lighting are updated. The most common project in Boca Raton‘s and Delray‘s country-club and 55+ communities, and the lower half of the range.
  • Full gut of a 1950s–70s bathroom. Everything to the studs, drains and supply lines replaced, floor releveled, new layout. Typical of Fort Lauderdale, East Boca and Delray ranch homes — the middle to upper part of the range, mostly because of plumbing.
  • Two bathrooms at once. The primary and a hall or kids’ bath in one project: one crew, one schedule. Doing both together costs noticeably less than two separate projects.

What moves a bathroom up or down the range

  • Moving the drain. A shower where the tub was is usually a short move; a new layout in a condo may not be possible at all because of the stack.
  • Curbless. A true curbless shower needs the slab recessed or the floor built up — more labor than a low curb.
  • Tile choice. Large-format porcelain is fast to lay; small mosaics and natural stone take longer and cost more per square foot.
  • Old plumbing. Cast-iron drains under a 1960s slab often need replacing while the room is open; we look during the consultation and price it up front.
  • Condo logistics. Elevator, work hours and the board package add time more than money.

How to compare two quotes

  1. Ask how the shower is waterproofed — pan, membrane, and what goes behind the tile. “Cement board and tile” is not a waterproofing system.
  2. Ask whether the vanity is a stock box or built to the wall, and what the box is made of.
  3. Check that demolition and disposal are included.
  4. Ask how the price can change after signing. Ours is fixed in the contract; additions are priced in writing before they are done.

Paying for it

Only a 10% deposit when you sign the contract; the rest is paid in stages tied to delivery, install start and the final walkthrough. Promotional financing may be available for qualified buyers through our lending partners; pre-qualification takes about a minute with a soft credit pull. See financing.

For kitchens, see the kitchen cost guide; for how the bathroom process runs, see bathroom remodeling.

Get a free in-home estimate

Share:

Book a free in-home estimate

We measure at your home and give you one written, itemized price, fixed before we start. Free, no obligation.

★ 4.9 · 56 client reviews · Own Factory · Family-Owned

What are you looking to remodel?

Pick one to continue.

Kitchen
Bathroom
Flooring
Whole Home
Other

When do you want to start?

This helps us plan the schedule.

⚡ASAP
📅1–3 months
🗓️3–6 months
🔍Just researching

Approximate budget?

We can help you review financing options if needed.

💵Under $10k
💰$10k–25k
💎$25k–50k
👑$50k+
🤔Not sure yet

What's your ZIP code?

We serve Miami-Dade, Broward, Palm Beach counties.

How can we reach you?

We'll call within 1 hour with a free, no-obligation estimate.

🔒 We use your details to respond to your request and never sell them. Privacy Policy
Kitchen & bath remodeling across South Florida: Aventura · Aventura bathrooms · Boca Raton · Boca Raton bathrooms · Boynton Beach · Boynton Beach bathrooms · Coral Gables · Coral Gables bathrooms · Coral Springs · Coral Springs bathrooms · Davie · Davie bathrooms · Delray Beach · Delray Beach bathrooms · Doral · Doral bathrooms · Fort Lauderdale · Fort Lauderdale bathrooms · Hialeah · Hialeah bathrooms · Hollywood · Hollywood bathrooms · Jupiter · Jupiter bathrooms · Kendall · Kendall bathrooms · Miami · Miami bathrooms · Miami Beach · Miami Beach bathrooms · Oakland Park · Oakland Park bathrooms · Parkland · Parkland bathrooms · Pembroke Pines · Pembroke Pines bathrooms · Pinecrest · Pinecrest bathrooms · Plantation · Plantation bathrooms · Pompano Beach · Pompano Beach bathrooms · Sunrise · Sunrise bathrooms · West Palm Beach · West Palm Beach bathrooms · Weston · Weston bathrooms
Service Areas — Miami-Dade, Broward & Palm BeachKitchen Remodeling  ·  Bathroom Remodeling  ·  Kitchen Remodeling Fort Lauderdale  ·  Kitchen Remodeling Miami  ·  Kitchen Remodeling Boca Raton  ·  Kitchen Remodeling Coral Springs  ·  Kitchen Remodeling Parkland  ·  Custom Kitchen Cabinets