D R E A M E R Y
Walk-In Showers and Tub-to-Shower Conversions

Bathrooms · Miami-Dade, Broward and Palm Beach

Walk-In Showers and Tub-to-Shower Conversions

The tub nobody uses comes out. In its place goes a shower you can walk into: a sloped, waterproofed floor, a low curb or none at all, glass, and a niche or a bench.

  • Built as a waterproofed system: pan, membrane, slope, drain
  • Low-curb or curbless, depending on what the slab allows
  • Blocking in the walls for grab bars, now or later
  • Fixed labor price and an itemized shopping list, no markup

Get Instant Estimate Call (786) 947-4333

Penalty-Backed Schedule · Finish Date in Writing Penalty-backed schedule
Bronze Stevie® 2026 · Sales & Customer Service Bronze Stevie® 2026
Own Factory · No Middleman, Direct Pricing Own cabinet factory
Family-Owned · Coral Springs, South Florida Family-owned
NKBA Member · National Kitchen & Bath Association NKBA member

Tub-to-shower conversion in South Florida: what is involved, what it costs, what to decide

In the country-club communities of Boca Raton, the 55+ villas of Delray and Boynton, and the 1980s and 1990s houses of Coral Springs and Weston, the same bathroom project comes up again and again: take out a tub nobody uses and build a shower two people can use. Done properly it is a small construction project, not a swap. Here is what actually happens, what it costs and the decisions you will be asked to make.

What is behind the tub

A tub sits on the slab with one drain in a fixed spot. A shower needs a floor sloped to a drain, a waterproof pan under the tile, walls waterproofed above it, and a threshold — or none. So the project is: demolition down to the studs and slab; relocating or rebuilding the drain (usually a short move within the old footprint); a new mixing valve and, often, a hand shower line; the pan and membrane; tile; and glass. In older houses we also look at the drain line itself — cast iron from the 1960s and 70s is often near the end of its life, and this is the moment to replace it.

Curb or curbless

A low-curb shower keeps a small step (a couple of inches) and is the simplest to build on a slab. A curbless shower has no step at all: the floor slopes continuously to a linear or corner drain. It needs the slab recessed or the floor built up around it, so it costs more and is not possible in every room. In a 55+ home it is what we recommend when the slab allows it. In both cases we put blocking in the walls so grab bars can be mounted later where the blocking is, without opening the tile.

Decisions you will make in the 3D design

  • Bench or no bench — a built-in bench takes floor area; a fold-down teak seat folds out of the way.
  • Niche — recessed shelving in the wall, placed so it is not on the exterior wall and not where the valve is.
  • Glass — frameless door, fixed panel, or open entry; an open entry needs a longer shower so the spray stays inside.
  • Tile format — large-format porcelain is fast and has few grout lines; mosaics on the floor grip better; natural stone needs sealing.
  • Valve — a thermostatic valve holds temperature when someone flushes elsewhere; worth it in a family home.
  • Ventilation — the exhaust fan is sized for the room and ducted outside, not into the attic.

What it costs in 2026

A conversion in an otherwise sound bathroom — new shower, new vanity, updated lighting — adds about 25% to our bathroom labor range. A small full bath runs $13,500–$15,500 in labor at the Essential level, so with the tub-to-shower conversion expect roughly $17,000–$19,000 in labor, plus the tile, glass and fixtures you buy at retail with our shopping list. A curbless shower, natural stone, or replacing old drain lines moves it up. Full line-by-line drivers are in our bathroom cost guide; the cost calculator prices the conversion in 60 seconds. Vanities come from our own Coral Springs shop, sized to the wall, so the cabinetry line carries no showroom markup.

Condos: one extra step

In a condo the drain must stay within reach of the building’s stack, and the association must approve the work before it starts — drawings, insurance, work hours. We prepare the package and design within the stack from the first sketch. Read the full process in our condo remodel guide.

How long

Shorter than a full gut renovation: demolition and rough plumbing in the first days, then waterproofing, tile, glass and trim. The finish date goes into your contract with a penalty schedule for delays on our side. Community approval, where required, comes before the start date.

Client videos

Hear it from our clients

Homeowners on their finished kitchens and bathrooms, filmed on site. All client reviews · YouTube channel

“Super happy with the result. Done in record time and budget-friendly.”Condo bathroom · Miami
“Not only was he professional to the end, he was very easy to work with.”Modern handleless kitchen · Davie
“The cabinetry worked out fantastic. I’m really pleased with the workmanship.”White shaker kitchen · South Florida
Ruslan, owner, with a client · Navy shaker kitchen

Miami-Dade, Broward & Palm Beach · Instant estimate

Know what your bathroom remodel costs before anyone walks through your door.

A few quick questions, one honest range built from what we actually charge in South Florida — not a national average from a website that has never seen your bathroom.

4.9 · 56 client reviews

Brown Bath to Elegant Retreat70s Retro Bath to Marble SpaOak to White Shaker Kitchen in Oakland Park

What it costs in 2026

What Dreamery bathrooms cost in 2026: a fixed labor price plus an itemized shopping list. You buy the finish materials (tile, fixtures, a stock vanity) at retail from our exact shopping list with no markup, or we build a custom vanity in our Coral Springs shop and quote it as its own line. A small full bath (5×8) runs $13,500–$15,500 in labor at the Essential level, $17,000–$19,500 at Signature and $21,500–$24,500 at Premium, plus roughly 35–70% of that for finish materials. Powder rooms start around $7,000; primary suites run $27,000–$49,000 in labor. Turning a tub into a walk-in shower adds about 25%. The in-home measure and the written, itemized estimate are free. 3D design package: $99 (regularly $500), free when you sign the contract.

Every bathroom gets a fixed labor price and an itemized shopping list, with no markup: demolition, waterproofing, tile and stone setting, vanity and fixture installation, plumbing and electrical changes and project management are priced in writing before work starts. You buy the finish materials from the shopping list at store price, so nothing hides in an allowance.

When the vanity and storage come from our own shop, you skip the showroom markup on the cabinetry line. Promotional financing is available for qualified buyers through our lending partners; pre-qualification takes about a minute with a soft credit pull.

See what goes into a high-end bathroom in our South Florida bathroom remodel guide, or get an exact number with a free in-home estimate.

Where we work

Miami-Dade, Broward and Palm Beach counties, from our own cabinet shop in Coral Springs.

Broward County

Palm Beach County

Miami-Dade County

Questions homeowners ask us

How much does a tub-to-shower conversion cost?

In a bathroom that is otherwise sound, the conversion adds about 25% to our bathroom labor range. A small full bath runs $13,500–$15,500 in labor at the Essential level before the conversion, and you buy the tile, glass and fixtures at retail from our shopping list. The calculator on this page gives the range for your own bathroom with the conversion included.

Can every bathroom have a curbless shower?

No. A curbless floor slopes all the way to the drain, so the slab has to be recessed or the floor built up around it. Where the slab allows it we recommend it, especially in a 55+ home. Where it does not, a low curb of a couple of inches is the simpler build.

Can grab bars be added later?

Yes. We put blocking in the walls while they are open, so grab bars can be added later where the blocking is, without opening the tile.

Can the tub in a condo become a shower?

Usually, within limits. The drain has to stay within reach of the building's stack, and the association approves the work before it starts. We design within the stack from the first sketch.

How long does a tub-to-shower conversion take?

Less time than a full gut renovation: demolition and rough plumbing in the first days, then waterproofing, tile, glass and trim. The finish date is written into your contract, and community approval, where it is required, comes before the start date.

Service Areas — Miami-Dade, Broward & Palm BeachKitchen Remodeling  ·  Bathroom Remodeling  ·  Kitchen Remodeling Fort Lauderdale  ·  Kitchen Remodeling Miami  ·  Kitchen Remodeling Boca Raton  ·  Kitchen Remodeling Coral Springs  ·  Kitchen Remodeling Parkland  ·  Custom Kitchen Cabinets