Monochrome & Brass Show-Kitchen
Kitchen Remodeling · Budget $59,000–$72,000 · 6 weeks on site

Before & after
Before
A wall of dark rosewood veneer, exposed shelving and a bulky island made the room feel cavernous and dated. Workflow was awkward, storage limited and the extraction hood dominated the sight-line.
After
Dreamery installed full-height, matte-white cabinetry with hidden pulls, framing a book-matched Carrara marble niche crowned by a custom brushed-brass hood. A fluted black marble island now seats four, while integrated Miele towers, brass fixtures and ambient LED strips create a gallery-like centerpiece. Floor tiles were refinished and slab doors conceal a walk-in pantry for clutter-free counters
Project Highlights
-
Timeline: 6 weeks from demolition to final punch-list -
Scope: structural soffit removal, new electrical panel, custom millwork, stone fabrication, plumbing re-rough, brass hood fabrication -
Client benefit: clear sight-lines to living area, island as social hub, 40% more concealed storage
Appraisal
Appraised +$110,000 on a $65,000 budget.
Want a result like this? Start with a $99 3D design
A Dreamery designer comes to your home with samples and measures — free. The written, itemized estimate is free too. The 3D design package is $99 instead of $500, and free when you sign the contract. Read more about our kitchen remodeling.
Book a free in-home estimate
We measure at your home and give you one written, itemized price, fixed before we start. Free, no obligation.


